A lot has happened in the past few days on the construction site of the new Diasbahn in Kappl. The removal of the old operating equipment is in full swing – the former cable car gondolas have been loaded onto trucks and, after undergoing a thorough technical refurbishment, will be reused at another location. The “rope support assemblies” (also known as roller batteries), which guide the cable along the towers, were also loaded with great care – these heavy yet sensitive components require precise handling and coordination during transport.
At the same time, work on the stations is progressing rapidly. At the bottom station, additional foundations have been poured, the first vertical supports have been installed, and the structure is gradually becoming visible. At the top station, the future layout is now also clearly taking shape.
A striking moment is the loading of the new tower components: what often appears slim and delicate from a distance reveals its true size when placed next to a person. With every construction step, the complexity and scale of this project become more tangible. One thing is clear: the new Diasbahn continues to grow!